Project details
| Assignment | Bathroom and toilet, plus plastering, painting and electrical work throughout the house |
|---|---|
| Location | Eindhoven |
| Completed | 2023 |
| Floor area | 150 m² |
| Duration | 7 weeks |
| Materials | Large-format Carrara-look tiles, walk-in shower with niche, bathtub, wall-hung smart toilet, double oak vanity unit, electric underfloor heating |
01 - The brief
Through a recommendation from our partners: a family bathroom that needed a complete redo - along with plastering, painting and new wiring throughout the house.
02 - Our approach
The bathroom stripped back to the brick: new pipework, electric underfloor heating and marble-look tiles up to the ceiling. Throughout the house: around twenty new sockets, smooth plasterwork and a complete paint job.
03 - The result
A light marble family bathroom - and a house that looks fresh again beyond the bathroom too.
Before / after
Gallery