Project details
| Assignment | Complete renovation of the guest toilets |
|---|---|
| Location | Stratum, Eindhoven |
| Completed | 2022 |
| Floor area | 35 m² |
| Duration | 5 weeks |
| Materials | Calacatta marble-look porcelain, anthracite doors, Grohe urinals, Geberit concealed cisterns, black ceiling |
01 - The brief
The dated toilets no longer matched the business. The wish: hygienic, presentable and built without having to close the doors.
02 - Our approach
Stripped back to the brick, new drainage and concealed systems, and large-format marble-look porcelain on walls and floors. The restaurant simply stayed open: we worked long night shifts and renovated the toilets one by one.
03 - The result
Toilets with the feel of a high-end restaurant - durable, easy to keep clean and finished on time.